Full analysis of Malaysia’s door and window installation process: What steps did the professional team take?

In Malaysia, many door and window problems are not caused by product quality, but by inadequate installation.
The truly professional process of installing doors and windows is much more complex than simply installing them. This article will take you through the complete process of installing standard doors and windows in Malaysia, so that you have a clear understanding when choosing suppliers.
1、 Home measurement (not just measuring width and height)
The first step in professional door and window installation is definitely on-site measurement.
The measurement content includes:
Wall structure and verticality
Is the window opening square
Original waterproof layer condition
Indoor and outdoor height difference
These will directly affect the quality of subsequent installation.
2、 Confirm the door and window scheme and configuration
Based on the on-site situation, the Chamber of Commerce for Doors and Windows suggests:
Appropriate opening method (push-pull/flat opening)
Glass type (single-layer/double-layer/Low-E)
Hardware system configuration
Anti theft and security requirements
This step determines the final user experience.
3、 Factory production and quality inspection
Local door and window manufacturers in Malaysia usually:
Customize according to size
Cutting and assembling profiles
Glass safety inspection
Overall inspection before leaving the factory
Ensure that the products delivered to the site are qualified.
4、 On site installation and fixation
During formal installation, the key points include:
Horizontal and vertical correction
Firmly fix the window frame
Reserve expansion joints
This step determines whether the doors and windows are smooth and durable.
5、 Waterproof treatment (very critical)
Malaysia has heavy rainfall, and waterproofing is of utmost importance.
Professional installation meeting:
Apply waterproof adhesive around the window frame
Dealing with drainage holes
Strengthen the waterproofing of window sills and corners
Avoid water seepage and leakage in the future.
6、 Debugging and Testing
After installation, it is necessary to:
Smooth switch test
leak test
Locks and Hardware Testing
Ensure that doors and windows are functioning properly.
7、 Cleaning and Delivery Instructions
Professional teams will:
Clean up the construction site
Teach customers how to use it correctly
Explain the scope of daily maintenance and warranty
This step is often overlooked, but it is very important.